GA Highway 83
Cabiness Road.
A large-format distribution concept in Monroe County. Explore the published plan for approximately 130 acres, including a proposed 1.51-million-square-foot building and substantial truck and trailer accommodation.

A plan with scale.
A conversation about feasibility.
The published site package illustrates a distribution development with deep truck courts, inbound queuing and room for trailer parking. These figures describe the design concept. Discuss current land availability, approvals and build-to-suit options with the Authority.
- Concept acreage
- Approximately 130 acres
- Proposed building
- 1,514,040 square feet
- Trailer parking
- 650 spaces + 217 future spaces in the concept
- Truck courts
- 205 feet deep in the concept
- Inbound truck queuing
- 20 positions in the concept
- Auto parking
- 348 spaces + approximately 100 future spaces
The broader tract map and the approximately 130-acre building concept show different scopes. Confirm the exact land area and boundaries for the current offering.
Turn a concept
into a project brief.
- Current offeringConfirm available land and development options
- InfrastructureRequest current utility service and capacity details
- ApprovalsDiscuss zoning, site approvals and permitting
- Design fitReview dock, trailer, truck and employee access needs
The rendering and dimensions show a proposed layout. They do not establish that the building exists or that the project has current approvals.
Pricing & availability
Ask the Authority for current terms and the space or land available.
Connected to a wider region.
Approximate distances from the linked property materials.
See the setting.
Keep the details close.
Use the published maps and documents to get familiar with the property. Open plans at full size and bring your questions to our local team.
Broader tract reference map
Earlier aerial and topography reference; its outline covers a different scope from the 130-acre building concept.
Site concept package
Proposed building layout, site rendering and regional connections.
Original documents may reflect earlier conditions, contacts or incentive programs. Request current availability, terms and project requirements from the Authority.
Bring your project.
Let’s talk about the fit.
Share the building size, dock configuration, trailer parking, power requirements and timing your operation needs. We can help you discuss the current property offering and whether the concept suits your project.
Your local starting point
Development Authority
of Monroe County

